Parking Lot Ready for Paving
The parking lot has been curbed, and the dirt surface has been heavily packed and rolled. Starting this morning, a continuous stream of dump trucks delivered piles and piles of stone -- enough to cover the entire parking lot 8 inches deep -- to our site.
Bulldozers then spread the rock evenly across the parking lot, and a roller packed them down. Finally, water was sprayed over the surface of the lot to help make it into a hard, dense surface that will be ready for paving on Monday.
At this point, there are two important rules for anyone visiting the site:
1. STAY OFF THE PARKING LOT!!!
The lot is curing and needs to remain untouched until the asphalt is poured in Tuesday.
2. STAY AWAY FROM THE DRIVEWAY ON TUESDAY!!!
Work on the parking lot was slowed when the dump trucks had trouble maneuvering around all the cars in the driveway. There will be many trucks of hot asphalt on Tuesday, so please do not drive through the campus until after 6pm that night!
Thanks for your cooperation and understanding!