Tuesday, August 30, 2005


Parking Lot Ready for Curb and Gutter

Mammoth Construction was hard at work today removing dirt from our parking lot and rolling it to a hard surface to prepare it for paving. The picture here shows the excavator removing the mound of dirt that once held that electrical pole. The excavator was packed up and moved off-site this afternoon, signalling that we're done with the "heavy lifting" on the site.

Tomorrow we will be pouring the cement curbs on the site. I'll try to post pictures tomorrow afternoon.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home