Monday, September 12, 2005


Fire Hydrant Line Run

Mammoth finished running the cast-iron water line that will supply the fire hydrant near our elementary building. This line will also eventually service our permanent buildings. It was difficult to run because of the size of the pipe and the number of buried lines they had to avoid when digging it.

Like the water line we ran down Baileywick road, this line will still need to be pressure tested and sanitized -- which will happen over the next couple days.

The last remaining water service needed is the small 2 inch line that will actually be run to our current buildings. That work begins tomorrow and should only take a couple days.

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home