Site Layout
The map to the left shows the work going on for this phase of the site (except for the fields).
Baileywick road runs along the bottom of the drawing. The paved parking loop is on the left side. The Yellow building is the lower school and has been fully assembled. The Blue building is the middle school (the one visible from Baileywick road) and is also fully assembled as of today. The Green building is where the cafeteria and administrative offices are, and is currently being assembled.
The High-School building is in orange. The pad for this building is being prepared today.
You can see part of the football field and track to the right of the Middle School and Admin buildings.
The black area is our main parking lot, which will be paved later this month.
1 Comments:
Chris,
Will the Lower School Modular and the Admin Modular be connected? I remember talk that all the modulars would be connected to keep students, faculty, and parents from having to go outside of one building to get to another. Please update.
Thanks,
Teresa
Post a Comment
Subscribe to Post Comments [Atom]
<< Home